Tuesday, October 23, 2007

Window and Sil Replacement



This is the before and after images.



This is what the windows looked like Old vs New











These images show the exterior window sil's that where cut out and replaced due to wood rot.





This is an interior image job complete.

Thursday, October 18, 2007

Installed tile @ kitchen

Extended deck 12'

Set up deck customer to finish at later date.

Installed commercial lighting in warehouse and painted parking lines

Installed stairs to 2nd floor exit.




This was an install of stairs to the 2nd floor at the rear of a commercial building.

Installed concrete slab.


This customer talked me into installing this concrete work.
I no longer do concrete only on this occasion.

Installed new garage door and frame


I installed new garage door and special framing. ( this is not typical I had to use 4"X4" post on the out side frame.Also skim coated rock wall on each side of drive way.

Set up deck customer to finish


I set up post for this customer to finish out himself.

Removed and replaced wax seal @ toilet flange



Removing and replacing a toilet flange seal.
There are two types of wax seals.
the standard and then the thicker type.
I always install the thicker type of wax seal.

1. Turn off water.
2. Remove tank lid and remove all water. Put towel in tank and remove all water.
3. Take one gallon bucket and pour water into toilet
to remove as much water as possible.
4. Disconnect water supply line at bottom of tank placing smaller bucket under tank to catch any water.
5. Remove Johnny bolts and tilt toilet towards front of toilet then check under toilet to see that there is no wax on bottom of toilet. If there is remove it.
6. After toilet is removed looking and old wax ring. Place plastic grocery sack over your hand and remove all wax.
7. Remove new wax seal from box placing on toilet flange at floor.
8. Install new Johnny bolt on toilet flange.
9. Reset toilet installing Johnny bolts nuts and water supply line.
10. Turn on water flush toilet five time check for leaks.
.

Thursday, October 11, 2007

Power washed and painted house.







Sunday, October 7, 2007

Installed new Double oven, Built in micro wave oven and dish washer.

Removed old built in oven



Installed new customer supplied stainless double oven.
Dry wall had to be cut and support frame built.